__________ is decided on the basis of ordering cost and carrying cost.
Official theoretical question paper for Introduction To Industrial Management (HSMC-501) conducted by Maulana Abul Kalam Azad University of Technology. All questions from Groups A, B, and C are reproduced below with marks weightings.
__________ is decided on the basis of ordering cost and carrying cost.
What is GOLF Analysis?
What is Function Cost Matrix?
ERP supports __________ currency value
Which type of organization is temporary by nature
Which colour is used to illustrate actual progress in bar charts?
What is the symbol for activity in a network diagram?
__________ shows minimum stock to be maintained.
Production Planning and Control function is crucial for ensuring efficiency and cost savings in __________
State the types of values
Who is the head of production department?
What is PERT Analysis?
List, in order, the six steps basic to both PERT and CPM.
Calculate minimum stock level, maximum stock level, and re-ordering level: (i) Maximum Consumption = 300 units per day (ii) Minimum Consumption = 180 units per day (iii) Normal Consumption = 190 units per day (iv) Reorder period = 10-15 days (v) Reorder quantity = 2,000 units (vi) Normal reorder period = 13 days.
Discuss the difference between CPM and PERT.
State the difference between Industrial management and Product Management.
What is Job Shop Production?
Write a short note on JIT.
State the advantages of JIT.
State the difference between authority and responsibility
State the process of creating an organization
State the types of formal organization
Write a short note on informal organization
A small project is composed of 7 activities whose time estimates are listed below. Activities are being identified by their beginning (i) and ending (j) node numbers. | Activities | Time in weeks | | | | | :--- | :--- | :--- | :--- | :--- | | | | to | tl | tp | | 1 | 2 | 1 | 1 | 7 | | 1 | 3 | 1 | 4 | 7 | | 1 | 4 | 2 | 2 | 8 | | 2 | 5 | 1 | 1 | 1 | | 3 | 5 | 2 | 5 | 14 | | 4 | 6 | 2 | 5 | 8 | | 5 | 6 | 3 | 6 | 15 | 1. Draw the network 2. Calculate the expected variances for each 3. Find the expected project completed time 4. Calculate the probability that the project will be completed at least 3 weeks than expected 5. If the project due date is 18 weeks, what is the probability of not meeting the due date?
A manufacturing company places a semi-annual order of 24,000 units at a price of Rs. 20 per unit. Its carrying cost is 15% and the order cost is Rs. 12 per order. Calculate: 1. What is the most economical order quantity? 2. How many orders need to be placed?