Concept, definition, types, parameters, variables and behavior. Management - definition and functions. Organization structure: i. Definition. ii. Goals. iii. Factors considered in formulating structure. iv. Types. v. Advantages and disadvantages. vi. Applications. Concept, meaning and importance of division of labor, scalar & functional processes, span of control, delegation of authority, centralization and decentralization in industrial management. Organizational culture and climate - meaning, differences and factors affecting them. Moral - factors affecting moral. Relationship between moral and productivity. Job satisfaction - factors influencing job satisfaction. Important provisions of factory act and labor laws.
UNIT 2
Critical Path Method (CPM) and Programme Evaluation Review Technique (PERT)
8 hrs
2.1 CPM & PERT - meaning, features, difference, applications. 2.2 Understand different terms used in network diagram. Draw network diagram for a real life project containing 10-15 activities, computation of LPO and EPO. (Take minimum three examples). Determination of critical path on network. Floats, its types and determination of floats. Crashing of network, updating and its applications.
UNIT 3
Materials Management
6 hrs
Material management - definition, functions, importance, relationship with other departments. Purchase - objectives, purchasing systems, purchase procedure, terms and forms used in purchase department. Storekeeping - functions, classification of stores as centralized and decentralized with their advantages, disadvantages and application in actual practice. Functions of store, types of records maintained by store, various types and applications of storage equipment, need and general methods for codification of stores. Inventory control: i. Definition. ii. Objectives. iii. Derivation for expression for Economic Order Quantity (EOQ) and numeric examples. iv. ABC analysis and other modern methods of analysis. v. Various types of inventory models such as Wilson's inventory model, replenishment model and two bin model. (Only sketch and understanding, no derivation ). 3.6 Material Requirement Planning (MRP) - concept, applications and brief details about software packages available in market.
UNIT 4
Production planning and Control (PPC)
8 hrs
Types and examples of production. PPC i. Need and importance. ii. Functions. iii. Forms used and their importance. iv. General approach for each type of production. Scheduling - meaning and need for productivity and utilisation. Gantt chart - Format and method to prepare. Critical ratio scheduling - method and numeric examples. Scheduling using Gantt Chart (for at least 5-7 components having 5-6 machining operations, with processes, setting and operation time for each component and process, resources available, quantity and other necessary data), At least two examples. 4.7 Bottlenecking - meaning, effect and ways to reduce.
UNIT 5
Value Analysis (VA) and Cost Control
4 hrs
5.1 VA - definition, terms used, process and importance. 5.2 VA flow diagram. DARSIRI method of VA. Case study of VA - at least two. Waste - types, sources and ways to reduce them. Cost control - methods and important guidelines.
UNIT 6
Recent Trends in IM
4 hrs
ERP (Enterprise resource planning) - concept, features and applications. Important features of MS Project. Logistics - concept, need and benefits. Just in Time (JIT) - concept and benefits. Supply chain management - concept and benefits.
Course Outcomes & Bloom's Taxonomy (6 COs)
K1: 2K3: 1K4: 1K5: 1K6: 1
CO1Recall
Bloom K1
Recall the concepts of Accounting and Recognize different systems used in industrial applications.
CO2Discuss
Bloom K1
Discuss on the design of appropriate accounting tool required for real life problems.
CO3Apply
Bloom K3
Apply and demonstrate the use of Economic concepts.
CO4Analyze
Bloom K4
Analyze and Simulate a sequential accounting tool for a system or process appropriate for required accuracy.
CO5Design
Bloom K6
Design a sequential economic policy that can work according to the required specifications.
CO6Justify
Bloom K5
Justify a specific accounting technique for a specific purpose.
CO-PO Correlation Matrix
Mapping Scale:
3Substantial (High)
2Moderate (Medium)
1Slight (Low)
—No Correlation
CO
PO1
PO2
PO3
PO4
PO5
PO6
PO7
PO8
PO9
PO10
PO11
PO12
PSO1
PSO2
CO1
3
—
—
—
—
—
—
—
—
—
—
—
—
—
CO2
—
3
—
—
—
—
1
—
—
—
—
—
—
—
CO3
—
—
—
—
3
—
—
—
—
—
—
—
—
—
CO4
—
—
3
—
—
—
—
—
—
—
—
—
—
—
CO5
—
—
—
—
—
—
—
—
1
—
—
—
—
—
CO6
—
—
—
—
—
—
—
—
—
—
—
—
—
—
AVG
3
3
3
—
3
—
1
—
1
—
—
—
—
—
Hover or click on any column heading (PO1–PO12, PSO1, PSO2) to read its official MAKAUT definition.